PROJECTS

List of major bridge designed and safety work completed by the company in last five years.

Year of WO# 2022-23

Bene Bridge
PWD, A.P.

Year of WO# 2021-22

Tali Bridge
PWD, A.P.

Year of WO# 2021-22

Peneng Bridge
PWD, A.P.

Year of WO# 2022-23

Balek Bridge at Pasighat
PWD, A.P.

Year of WO# 2021-22

IAB Changlang
PWD, A.P.

Year of WO# 2021-22

Arch Bridge across Kurung River
PWD, A.P.

Year of WO# 2022-23

Construction of steel suspension bridge (modified as steel truss bridge) across Kamala (Kumey) river in road Jha to Ruhi in Kradadi district of Arunachal Pradesh.
PWD, A.P.

Year of WO# 2021-22

Design of steel composite girder bridge at Goloso Nallah in Pakke Seijosa Itakhola Road under NEC (span 60m
PWD, A.P.

Year of WO# 2021-22

Design of steel composite girder bridge at river Paso in Pakke-Seijosa Itakhola Road under NEC (span (100m)
PWD, A.P.

Year of WO# 2021-22

Construction of composite bridge over river Bali in Pakke Seijosa Itakhola Road under NEC (span 70m)
PWD, A.P.

Year of WO# 2021-22

Construction of composite bridge over river Taraso in Pakke Seijosa Itakhola Road under NEC (Span 50m)
PWD, A.P.

Year of WO# 2021-22

Construction of Composite (Integral Abutment) bridge across Sukha Nallah in Pakke Seijosa Itakhola Road (span 30m
PWD, A.P.

Year of WO# 2021-22

Construction of steel composite bridge across senki river in between police colony and Economic and Statistics complex at Itanagar (span 50m)
PWD, A.P.

Year of WO# 2020-21

Construction of steel composite bridge across se across river senki view connecting police colony and senki view complex at Itanagar
PWD, A.P.

Year of WO# 2019-20

Construction of permanent bridge across river Pachin near central Jail (to be renamed as Tarh Peeju) (span (100m) at Itanagar
PWD, A.P.

Year of WO# 2019-20

Construction of steel arch bridge over river Pare to connect Government Engineering college at Toru (span 60m)
PWD, A.P.

Year of WO# 2019-20

Construction of double lane with footpath Steel Arch Bridge across Pachin River connection Halipad and Borum village at Naharlagun
PWD, A.P.

Year of WO# 2019-20

Construction of RCC bridge at Peneng River at chainage 3.60 km with well foundation in Mirem Mikong Ruksin Road in East Siang District, Arunachal
PWD , A.P.
PROJECTS

List of Major Bridge designed by undersigned independently
during last 3 years.

Road length 20km Minor Bridge of span 15m 2 Nos

Improvement of road from Pasighat to Remi under CRIF 2021-22 (including design of cross drainage and minor bridge works)
20/03/2023

2x35m= 70m

RCC Composite Bridge at Bali River.
23/02/2022

2x24.50m = 49.0m

RCC Composite Bridge at Tarasso River.
2x24.50m = 49.0m

1x84m = 84m

Construction of permanent steel bridge across Kumey river in Jha to Ruhi Road in KraDaadi
16/01/2023

2x75m =150m

Construction of permanent (Composite Steel) bridge across river Yargapsu to connect Singbir Village (Span 160m) Designed as Steel Arch Bridge
10/01/2023

1x30m = 30.0m

Construction of Road from Leriak, Sogum, Jarjory and Jitu to Goba EAC HQ SH: Bridge of span 30m
28/10/21